I was supposed to have this done before Amy got here with her family for Thanksgiving. Maybe it will be done by Dec 12 when Diane's family is here for Christmas!
Cabinets are built and ready to install and paint.
Plumbing is done (moved inside the wall, it was outside) Had to move the gas line, hot and cold water, and drain. I also installed two additional outlets for the vending machine and the dryer. Installed new sub-floor & insulation (I'm trying to figure out how to get a heater vent in here.)
Actually as of Nov. 23. 2010, the sheet rock is also installed, but I don't have a picture yet.
Actually as of Nov. 23. 2010, the sheet rock is also installed, but I don't have a picture yet.
So, just need to paint, install & paint cabinets, install floor, base & case, and new door to kitchen.
By Dec 12? Piece of cake!